Its Saturday and all the gib board is up in the lounge, one piece is 4m long and will probably be the longest piece in the house there were 2 pieces that could have been almost 6m but I opted to join them and the pieces of batten you see screwed to the ceiling are there to create a hollow for the plasterer and will be removed once the glue has dried, it is so good to have done this as it was a dirty job and have still got the itches from dealing with the fiberglass batts as its the older one that has more itch than the newer batts.
I have decided to employ a professional plasterer as I think a lounge ceiling needs to be well done then its time to get on with a new window and sliding door so I can complete those walls and do the coveing.
I was able to celebrate the ceiling with fresh strawberry from the garden well I have had 2 of them but if I can keep the birds off them there are more to come and if you look closely there are tomatoes growing behind that if I keep watering them should produce, we are having dry weather and most days are warm and sunny so some of the solar water heating tubes have been turned around so we don't produce more hot water than we need and have to waste it.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment