There are only 4 cabinets in the kitchen one is already fixed on the wall, this is the last one to be made, the draws are all made 4 in each side this one has a painted back on it and 2 doors on this side there will be a half round shelf under the compass point and a power outlet.
We are mid winter it is cold at night and 3 days of rain common so its no time to have holes in the house walls and no ceiling, we have a house guest who we need to cook for each day so we need an operational kitchen.
I am thinking I will wait till summer before I demolish the kitchen then we can cook, eat and do the dishes outside, I will isolate the kitchen from the house as it is a very dusty time pulling ceilings down and gib board from the walls, I can see a minimum of 2 weeks but more like 4 weeks before the kitchen is usable again, I have 8 doors for the cupboards to make, draw fronts to prepare, and some end panels to make and paint, but this is not 5 months work so what to do, our winter has some lovely days be they cold and short so working in the garden can be better than in the man cave.
I began by washing pebbles that had been in the garden for years and were more than pebbles, I removed a small tree stump and turned over the grass, by now its very sticky earth from all the water used in washing pebbles so I moved to the front garden to remove a tree stump for two days and what a rewarding 2 days now that it is all gone as we have some plant cuttings about ready for planting out, we get a lot of water run off from that concrete slab so I hope I have created a area for the water to go along with a dry path to the washing line when this is all covered with pebbles.
More photos soon to explain and show an end result.